The foundation work completed. Frame, diorama box, lighting and track design completed.
First step is to mark the key track geometry ie road centers and turnouts from the full-scale [1:1] drawing onto the foam. see drawing to the left of the layout.
Next - glue down foam road bed and flexi-track [recycled peco 80]. All the track was washed with degreaser, pre-wired with feeders, primed with gray paint.
 |
my old peco code 80 with some new bits |
The reversing loop has down grade to the rear main line. Needed a gentle cutting of the foam, and filled with spack.
 |
The cat supervising me. |